Ready to bring your vision to life? We offer site visits to understand your needs, discuss design ideas, and provide an accurate quotation.
JALAN ISMAIL
Project Location
Address: Jalan Ismail
Status : Ongoing
Existing Structure: The current 3-storey detached dwelling house stands on the specified lot.
Proposed Reconstruction: The project involves a comprehensive reconstruction of the existing dwelling, including architectural enhancements, interior layout modifications, and the addition of an attic space.
Design Aesthetics: The project aims for a harmonious blend of contemporary design elements while respecting the existing neighborhood character.
Modernization: Update the dwelling to meet modern living standards and functional requirements.
Optimized Space: Maximize usable space within the existing footprint.
Energy Efficiency: Incorporate sustainable features for energy conservation.
Enhanced Aesthetics: Create an appealing facade and interior design.
Timely Completion: Adhere to project timelines for efficient delivery.
Design and Approvals: Estimated 2 months
Construction: Anticipated duration of 11 months
GREENFEILD DRIVE
Address: Greenfield Drive
Status: Completed
Existing Structure: The current 3-storey semi-detached dwelling house with a mezzanine and attic.
Proposed Additions & Alterations: The project involves significant modifications to enhance the existing dwelling. Key aspects include:
Spatial Reconfiguration: Optimizing room layouts, circulation, and functional spaces.
Mezzanine Enhancement: Refining the mezzanine level for improved usability.
Attic Transformation: Converting the attic into habitable space (e.g., additional bedrooms, study area, or recreational room).
Architectural Upgrades: Enhancing the facade, roof design, and overall aesthetics.
Energy-Efficient Features: Incorporating sustainable elements for energy conservation.
Harmonious Integration: The proposed additions and alterations will seamlessly blend with the existing structure while respecting its architectural character.
Modern Living: Prioritizing comfort, natural light, and efficient use of space.
Greenfield Connection: Creating a strong connection between indoor and outdoor spaces, including landscaping and garden design.
Design and Approvals: Estimated duration of 1 months
Construction: Anticipated completion within 4 months
CARMEN TARRACE
Address: Carmen Terrace
Status : OnGoing
Existing Structure: The current building at Carmen Terrace.
Proposed Alterations and Additions: The project involves significant modifications to enhance the existing structure. Key aspects include:
Spatial Reconfiguration: Optimizing room layouts, circulation, and functional spaces.
Architectural Upgrades: Enhancing the facade, roof design, and overall aesthetics.
Energy-Efficient Features: Incorporating sustainable elements for energy conservation.
Interior Enhancements: Improving living spaces, kitchen, bathrooms, and other essential areas.
Seamless Integration: The proposed alterations and additions will seamlessly blend with the existing architecture while enhancing its functionality.
Modernization: Prioritizing comfort, natural light, and efficient use of space.
Preserving Character: Respecting the historical context of the neighborhood while introducing contemporary elements.
Design and Approvals: Estimated duration of 1 months
Construction: Anticipated completion within 10 months
ELLIOT WALK
Project Location
Address: Elliot Walk
Status : Ongoing
Existing Structure: The current 2-storey Semi-detached dwelling house stands on the specified lot.
Proposed Reconstruction: The project involves a comprehensive reconstruction of the existing dwelling, including architectural enhancements, interior layout modifications, and the addition of an attic space.
Design Aesthetics: The project aims for a harmonious blend of contemporary design elements while respecting the existing neighborhood character.
Modernization: Update the dwelling to meet modern living standards and functional requirements.
Optimized Space: Maximize usable space within the existing footprint.
Energy Efficiency: Incorporate sustainable features for energy conservation.
Enhanced Aesthetics: Create an appealing facade and interior design.
Timely Completion: Adhere to project timelines for efficient delivery.
Design and Approvals: Estimated 2 months
Construction: Anticipated duration of 10 months
Bedok Avenue
Address: Bedok Avenue
Status: Ongoing
Existing Structure: The current 3-storey semi-detached dwelling house with a mezzanine and attic.
Proposed Additions & Alterations: The project involves significant modifications to enhance the existing dwelling. Key aspects include:
Spatial Reconfiguration: Optimizing room layouts, circulation, and functional spaces.
Mezzanine Enhancement: Refining the mezzanine level for improved usability.
Attic Transformation: Converting the attic into habitable space (e.g., additional bedrooms, study area, or recreational room).
Architectural Upgrades: Enhancing the facade, roof design, and overall aesthetics.
Energy-Efficient Features: Incorporating sustainable elements for energy conservation.
Harmonious Integration: The proposed additions and alterations will seamlessly blend with the existing structure while respecting its architectural character.
Modern Living: Prioritizing comfort, natural light, and efficient use of space.
Greenfield Connection: Creating a strong connection between indoor and outdoor spaces, including landscaping and garden design.
Design and Approvals: Estimated duration of 1 months
Construction: Anticipated completion within 6 months
Exeter Road
Address: Exeter Road
Status: Completed
Proposed Lighting Protector works: The project involves lighting protector works for the 9 storey building.
Sembawang Drive
Project Location
Address: Sembawang Drive
Status : Ongoing
Existing Structure: The current 1-storey inter-terrace house stands on the specified lot.
Proposed Reconstruction: The project involves a comprehensive reconstruction of the existing dwelling, including architectural enhancements, interior layout modifications, and the addition of an attic space.
Design Aesthetics: The project aims for a harmonious blend of contemporary design elements while respecting the existing neighborhood character.
Modernization: Update the dwelling to meet modern living standards and functional requirements.
Optimized Space: Maximize usable space within the existing footprint.
Energy Efficiency: Incorporate sustainable features for energy conservation.
Enhanced Aesthetics: Create an appealing facade and interior design.
Timely Completion: Adhere to project timelines for efficient delivery.
Design and Approvals: Estimated 2 months
Construction: Anticipated duration of 10 months